This equipment is provided with functions of aluminum bar saw bench and heating for aluminum bars.which can complete relebant operations concurrently.
Fuels required:liquefied petroleum gas,light oil,natural gas,town gas and producer gas.
The lead time from the normal temperature to the operating temperature is approximately 3 or 4 hours.it can reduce the energy burn-up(burn-up for continuous production:25-35kg/Al),and minimize the number of production workers on the production line.
It can solve the problem with the replacement of aluminum bar in case of in consistent product specifications.reduce the wastage caused by the cutting operation of the short bar,and can increase the yield of extruded products by 5-8%.
Temperature variation of aluminum bar: ±8℃
|