This equipment is provided with functions of aluminum bar saw bench and heating for aluminumbars.which can compltet relevant operations concurrently.
The lead time from the normal temperature to the operating temperature is only 20minutes.it can reduce the energy burn-up(burn-up for continuous productions,:8-12m3/t.Al),and minimize the numer of production worers working on the production line.
It can solven the problem with the replacement of aluminum bar in case of in consistent product specifications,reduce the wastage caused by the cutting operation of the short ba,and can increase the yleld of extruded products by 5-8%.temperature variation of aluminum bar:±8℃
|